[PDF] 2015 Groundwater Monitoring Report Project Shoal Area - eBooks Review

2015 Groundwater Monitoring Report Project Shoal Area


2015 Groundwater Monitoring Report Project Shoal Area
DOWNLOAD

Download 2015 Groundwater Monitoring Report Project Shoal Area PDF/ePub or read online books in Mobi eBooks. Click Download or Read Online button to get 2015 Groundwater Monitoring Report Project Shoal Area book now. This website allows unlimited access to, at the time of writing, more than 1.5 million titles, including hundreds of thousands of titles in various foreign languages. If the content not found or just blank you must refresh this page





2015 Groundwater Monitoring Report Project Shoal Area


2015 Groundwater Monitoring Report Project Shoal Area
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 2016

2015 Groundwater Monitoring Report Project Shoal Area written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2016 with categories.


The Project Shoal Area in Nevada was the site of a 12-kiloton-yield underground nuclear test in 1963. Although the surface of the site has been remediated, investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and hydraulic head monitoring are conducted at the site as part of the subsurface corrective action strategy. The corrective action strategy is currently focused on revising the site conceptual model (SCM) and evaluating the adequacy of the monitoring well network. Some aspects of the SCM are known; however, two major concerns are the uncertainty in the groundwater flow direction and the cause of rising water levels in site wells west of the shear zone. Water levels have been rising in the site wells west of the shear zone since the first hydrologic characterization wells were installed in 1996. Although water levels in wells west of the shear zone continue to rise, the rate of increase is less than in previous years. The SCM will be revised, and an evaluation of the groundwater monitoring network will be conducted when water levels at the site have stabilized to the agreement of both the U.S. Department of Energy Office of Legacy Management and the Nevada Division of Environmental Protection.



Data Validation Package May 2015 Groundwater Sampling At The Shoal Nevada Site


Data Validation Package May 2015 Groundwater Sampling At The Shoal Nevada Site
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 2016

Data Validation Package May 2015 Groundwater Sampling At The Shoal Nevada Site written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2016 with categories.


The U.S. Department of Energy Office of Legacy Management conducted annual sampling at the Shoal, Nevada, Site (Shoal) in May 2015. Groundwater samples were collected from wells MV-1, MV-2, MV-3, MV-4, MV-5, H-3, HC-1, HC-2d, HC-3, HC-4, HC-5, HC-6, HC-7, HC-8, and HS-1. Sampling was conducted as specified in the Sampling and Analysis Plan for US. Department of Energy Office of Legacy Management Sites (LMS/PRO/S04351, continually updated, http://energy.gov/lm/downloads/sampling-and-analysis-plan-us-department-energy office-legacy-management-sites). Monitoring wells MV-1, MV-2, MV-3, MV-4, MV-5, HC-2d, HC-4, HC-5, HC-7, HC-8, and HS-1 were purged prior to sampling using dedicated submersible pumps. At least one well casing volume was removed, and field parameters (temperature, pH, and specific conductance) were allowed to stabilize before samples were collected. Samples were collected from wells H-3, HC-1, HC-3, and HC-6 using a depth-specific bailer because these wells are not completed with dedicated submersible pumps. Samples were submitted under Requisition Index Number (RIN) 15057042 to ALS Laboratory Group in Fort Collins, Colorado, for the determination of bromide, gross alpha, gross beta, tritium, uranium isotopes, and total uranium (by mass); and under RIN 15057043 to the University of Arizona for the determination of carbon-14 and iodine-129. A duplicate sample from location MV-2 was included with RIN 15057042. The laboratory results from the 2015 sampling event are consistent with those of previous years with the exception of sample results from well HC-4. This well continues to be the only well with tritium concentrations above the laboratory's minimum detectable concentration which is attributed to the wells proximity to the nuclear detonation. The tritium concentration (731 picocuries per liter [pCi/L]) is consistent with past results and is below the U.S. Environmental Protection Agency's (EPA) maximum contaminant level (MCL) of20,000 pCi/L. However, concentrations of gross alpha, uranium, and carbon-14 all increased in the sample from well HC-4 during this sampling event. Concentrations of gross alpha and uranium have been above the EPA MCLs in this well since 2012 and the highest concentrations of gross alpha (60.6 pCi/L) and uranium (110 micrograms per liter) were detected during this sampling event. Refer to the time-concentration plots included with this report. Also see the 2015 Groundwater Monitoring Report Project Shoal Area: Subsurface Corrective Action Unit 447 for additional information on the 2015 sampling results.



Groundwater Monitoring Report Project Shoal Area Corrective Action


Groundwater Monitoring Report Project Shoal Area Corrective Action
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 2008

Groundwater Monitoring Report Project Shoal Area Corrective Action written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2008 with categories.


This report presents the 2007 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Corrective Action Unit (CAU) 447 located in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management (DOE-EM) to DOE-LM on October 1, 2006. Requirements for CAU 447, as specified in the Federal Facility Agreement and Consent Order (FFACO 2005) entered into by DOE, the U.S. Department of Defense (DOD), and the State of Nevada, includes groundwater monitoring in support of site closure. This is the first groundwater monitoring report prepared by DOE-LM for the PSA.



2012 Groundwater Monitoring Report Project Shoal Area Subsurface Corrective Action


2012 Groundwater Monitoring Report Project Shoal Area Subsurface Corrective Action
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 2013

2012 Groundwater Monitoring Report Project Shoal Area Subsurface Corrective Action written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2013 with categories.


The Project Shoal Area (PSA) in Nevada was the site of a 12-kiloton underground nuclear test in 1963. Although the surface of the site has been remediated, investigation of groundwater contamination resulting from the test is still in the corrective action process. Annual sampling and hydraulic head monitoring are conducted at the site as part of the subsurface corrective action strategy. Analytical results from the 2012 monitoring are consistent with those of the previous years, with tritium detected only in well HC-4. The tritium concentration in groundwater from well HC-4 remains far below the U.S. Environmental Protection Agency-established maximum contaminant level of 20,000 picocuries per liter. Concentrations of total uranium and gross alpha were also detected during this monitoring period, with uranium accounting for nearly all the gross alpha activity. The total uranium concentrations obtained from this monitoring period were consistent with previous results and reflect a slightly elevated natural uranium concentration, consistent with the mineralized geologic terrain. Isotopic ratios of uranium also indicate a natural source of uranium in groundwater, as opposed to a nuclear-test-related source. Water level trends obtained from the 2012 water level data were consistent with those of previous years. The corrective action strategy for the PSA is currently focused on revising the site conceptual model (SCM) and evaluating the adequacy of the current monitoring well network. Some aspects of the SCM are known; however, two major concerns are the uncertainty in the groundwater flow direction and the cause of rising water levels in site wells west of the shear zone. Water levels have been rising in the site wells west of the shear zone since the first hydrologic characterization wells were installed in 1996. While water levels in wells west of the shear zone continue to rise, the rate of increase is less than in previous years. The SCM will be revised, and an evaluation of the groundwater monitoring network will be conducted when water levels at the site have stabilized.



2009 Groundwater Monitoring Report Project Shoal Area Corrective Action


2009 Groundwater Monitoring Report Project Shoal Area Corrective Action
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 2010

2009 Groundwater Monitoring Report Project Shoal Area Corrective Action written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2010 with categories.


This report presents the 2009 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended February 2008) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes monitoring in support of site closure. This report summarizes investigation activities associated with CAU 447 that were conducted at the PSA during fiscal year 2009.



2008 Groundwater Monitoring Report Project Shoal Area Corrective Action


2008 Groundwater Monitoring Report Project Shoal Area Corrective Action
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 2009

2008 Groundwater Monitoring Report Project Shoal Area Corrective Action written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2009 with categories.


This report presents the 2008 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 located in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended February 2008) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes proof of concept monitoring in support of site closure. This report summarizes investigation activities associated with CAU 447 that were conducted at the site during 2008. This is the second groundwater monitoring report prepared by LM for the PSA.



2010 Groundwater Monitoring Report Project Shoal Area Corrective Action


2010 Groundwater Monitoring Report Project Shoal Area Corrective Action
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 2011

2010 Groundwater Monitoring Report Project Shoal Area Corrective Action written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2011 with categories.


This report presents the 2010 groundwater monitoring results collected by the U.S. Department of Energy (DOE) Office of Legacy Management (LM) at the Project Shoal Area (PSA) Subsurface Corrective Action Unit (CAU) 447 in Churchill County, Nevada. Responsibility for the environmental site restoration of the PSA was transferred from the DOE Office of Environmental Management to LM on October 1, 2006. The environmental restoration process and corrective action strategy for CAU 447 are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO 1996, as amended March 2010) entered into by DOE, the U.S. Department of Defense, and the State of Nevada. The corrective action strategy for the site includes monitoring in support of site closure. This report summarizes the results from the groundwater monitoring program during fiscal year 2010.



March 2011 Groundwater Sampling At The Project Shoal Site Data Validation Package


March 2011 Groundwater Sampling At The Project Shoal Site Data Validation Package
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 2011

March 2011 Groundwater Sampling At The Project Shoal Site Data Validation Package written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2011 with categories.


The U.S. Department of Energy Office of Legacy Management conducted annual sampling at the Project Shoal Area (Shoal) in March 2011. Wells HC-1, HC-2, HC-4, HC-5, HC-6, HC-7, MV-1, MV-2 and MV-3 were sampled as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PLN/S04351, continually updated). Two extra tritium samples were collected from well HC-4, one sample (HC-4-400) was collected at about 1/3 of the purge volume (135 gallons), the second sample (HC-4-400) was collected at 2/3 of purge volume (270 gallons). These additional samples were collected prior to completing the well purging process to evaluate the effects well purging has on the analytical results. Samples were not collected from locations HC-3 and HC-8 at the direction of the S.M. Stoller Corporation site lead.



March 2010 Groundwater Sampling At The Project Shoal Site Nevada Data Validation Package


March 2010 Groundwater Sampling At The Project Shoal Site Nevada Data Validation Package
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 2011

March 2010 Groundwater Sampling At The Project Shoal Site Nevada Data Validation Package written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2011 with categories.


The U.S. Department of Energy Office of Legacy Management conducted annual sampling at the Project Shoal Area (Shoal) in March 2010. Wells HC-4, HC-5, HC-7, HC-8, MV-1, MV-2 and MV-3 were sampled March 10-12, 2010, as specified in the Sampling and Analysis Plan for U.S. Department of Energy Office of Legacy Management Sites (LMS/PLN/S04351, continually updated). Wells HC-1, HC-2, HC-3, and HC-6 were sampled March 24, 2010, by Desert Research Institute personnel.



2010 Groundwater Monitoring Report


2010 Groundwater Monitoring Report
DOWNLOAD
Author : Matrix Solutions Inc
language : en
Publisher:
Release Date : 2011

2010 Groundwater Monitoring Report written by Matrix Solutions Inc and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2011 with Groundwater categories.