[PDF] General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix C Geotechnical Report - eBooks Review

General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix C Geotechnical Report


General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix C Geotechnical Report
DOWNLOAD

Download General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix C Geotechnical Report PDF/ePub or read online books in Mobi eBooks. Click Download or Read Online button to get General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix C Geotechnical Report book now. This website allows unlimited access to, at the time of writing, more than 1.5 million titles, including hundreds of thousands of titles in various foreign languages. If the content not found or just blank you must refresh this page





General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix C Geotechnical Report


General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix C Geotechnical Report
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 1989

General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix C Geotechnical Report written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1989 with categories.


This appendix considers all Geotechnical studies and data used to support the Studies for navigation improvements at Gulfport Harbor.



General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix D Environmental Documentation


General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix D Environmental Documentation
DOWNLOAD
Author : Susan I. Rees
language : en
Publisher:
Release Date : 1989

General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix D Environmental Documentation written by Susan I. Rees and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1989 with categories.


Volume contains copies of pertinent environmental documentation. National Park Service Letter; Final Fish and Wildlife Coordination Act Report; Effects of Sediment from the Gulfport, Mississippi Channel on Representative Marine Organisms; Chemical Analyses of Sediment from Gulfport, Mississippi, and Tissues of Marine Organisms Exposed to the Sediment; Cultural Resource Reports; Section 404(b)(1) Evaluation for Authorized Navigation Improvements at Gulfport Harbor, Mississippi, Section 103 Ocean Dredged Material Disposal Evaluation, Endangered Species Letters; and Gulfport Harbor, Mississippi Thin Layer Demonstration Program. (jhd).



Government Reports Annual Index


Government Reports Annual Index
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 1990

Government Reports Annual Index written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1990 with Government publications categories.




General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Main Report


General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Main Report
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 1990

General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Main Report written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1990 with categories.


This report consists of an economic, engineering and environmental reanalysis of the proposed modifications to the existing Federal project for commercial navigation at Gulfport Harbor, Mississippi. Improvements to the existing Federal project at Gulfport Harbor, Mississippi, were authorized by the Supplemental Appropriations Act of Fiscal Year 1985 (PL 99-88 dated 15 August 1985). This Act was modified by the Water Resources Development Act (WRDA) of 1986 (PL 99-662 dated 17 November 1986), and further modified by the Water Resources Development Act of 1988 (PL 100-676 dated 17 November 1988). The authorization in the WRDA of 1986 provides for construction and maintenance of a project 36 feet deep by 300 feet wide in Mississippi Sound, 38 feet deep by 400 feet wide through Ship Island Bar, relocation of the Ship Island Bar channel 1, 000 feet west of the present channel alignment with appropriate bend widening at each end, and a littoral drift impoundment basin 38 feet deep by 300 feet wide by 2,000 feet long opposite the western tip of Ship Island.



Government Reports Announcements Index


Government Reports Announcements Index
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 1990

Government Reports Announcements Index written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1990 with Science categories.




General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix F Regional Impact And Financial Analysis


General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix F Regional Impact And Financial Analysis
DOWNLOAD
Author : Evelyn H. Brown
language : en
Publisher:
Release Date : 1990

General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix F Regional Impact And Financial Analysis written by Evelyn H. Brown and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1990 with categories.


General impacts were calculated using MARAD's Portkit input/output model for increases in jobs, business sales, and state incomes, taxes and port revenues. CERL's EIFS input/output model was used to calculate project construction impacts. Several payback scenarios were analyzed from the state prospective for cost recovery of both the Corps deepening project and containeryard expansion project. A financial analysis included sources and uses of the state's share of costs of deepening the channel to 36 feet. Keywords: Regional impacts; Financial and cost recovery analysis; Construction impacts; Tonnage throughput increases; Increases in state and local incomes; Harbor deepening; Containeryard expansion. (kr).



General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix A Economic Analysis


General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix A Economic Analysis
DOWNLOAD
Author : Evelyn Brown
language : en
Publisher:
Release Date : 1990

General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix A Economic Analysis written by Evelyn Brown and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1990 with categories.


This report contains a detailed economic analysis for channel improvements at Gulfport Harbor. (jhd).



General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix E Thin Layer Disposal


General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix E Thin Layer Disposal
DOWNLOAD
Author : Susan I. Rees
language : en
Publisher:
Release Date : 1989

General Design Memorandum Gulfport Harbor Mississippi Design Memorandum Number 1 Appendix E Thin Layer Disposal written by Susan I. Rees and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1989 with categories.


This report presents the results of a one year monitoring program of the impacts associated with the thin-layer disposal of 50,000 cubic yards of new work dredged material in Mississippi Sound. The object of thin-layer disposal is two fold: (1) the placement of dredged material in open water in a layer 12 inches thick or less and (2) reduction of short term impacts to the aquatic ecosystem. Results of this monitoring program indicate that: (1) It is possible to control lift-thickness during open water disposal. (2) Recovery of benthos following a December disposal operation begins as early as 6-weeks post disposal abundances within the disposal area are similar to non-disposal areas. (3) Recruitment to the disposal area, following the December disposal, was mediated by adult migration, followed by spring larval settlement. Keywords: Thin layer disposal; Environmental monitoring; Water quality; Bathymetry; Macrofauna; Fishery; Vertical sediment profile. (jhd).



Environmental Pollution Control


Environmental Pollution Control
DOWNLOAD
Author :
language : en
Publisher:
Release Date :

Environmental Pollution Control written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on with Pollution categories.




Energy Research Abstracts


Energy Research Abstracts
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 1990

Energy Research Abstracts written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1990 with Power resources categories.