[PDF] Installation Restoration Program Irp Stage 3 Finding Of No Significant Impact Operable Unit B Engineering Evaluation Cost Analysis Environmental Assessment And Removal Action - eBooks Review

Installation Restoration Program Irp Stage 3 Finding Of No Significant Impact Operable Unit B Engineering Evaluation Cost Analysis Environmental Assessment And Removal Action


Installation Restoration Program Irp Stage 3 Finding Of No Significant Impact Operable Unit B Engineering Evaluation Cost Analysis Environmental Assessment And Removal Action
DOWNLOAD

Download Installation Restoration Program Irp Stage 3 Finding Of No Significant Impact Operable Unit B Engineering Evaluation Cost Analysis Environmental Assessment And Removal Action PDF/ePub or read online books in Mobi eBooks. Click Download or Read Online button to get Installation Restoration Program Irp Stage 3 Finding Of No Significant Impact Operable Unit B Engineering Evaluation Cost Analysis Environmental Assessment And Removal Action book now. This website allows unlimited access to, at the time of writing, more than 1.5 million titles, including hundreds of thousands of titles in various foreign languages. If the content not found or just blank you must refresh this page





Installation Restoration Program Irp Stage 3 Finding Of No Significant Impact Operable Unit B Engineering Evaluation Cost Analysis Environmental Assessment And Removal Action


Installation Restoration Program Irp Stage 3 Finding Of No Significant Impact Operable Unit B Engineering Evaluation Cost Analysis Environmental Assessment And Removal Action
DOWNLOAD
Author : RADIAN CORP SACRAMENTO CA.
language : en
Publisher:
Release Date : 1991

Installation Restoration Program Irp Stage 3 Finding Of No Significant Impact Operable Unit B Engineering Evaluation Cost Analysis Environmental Assessment And Removal Action written by RADIAN CORP SACRAMENTO CA. and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1991 with categories.


The Department of the Air Force has prepared an Engineering Evaluation/Cost Analysis and assessment of environmental impact to respond to contaminated ground water in Operable Unit (OU) B at McClellan AFB, California. Proposed action involves: (1) installation of extraction wells; (2) extraction of contaminated ground water; (3) treatment of extracted groundwater; and (4) release of the treated groundwater. Additional ground water monitoring, abandonment of a contaminated production well, continued extraction from a production well, and restriction on the use of a third production well are also proposed as integral parts of the restoration and water reclamation activity. This action only covers short-term measures to reduce the potential for increased health risks from the migration of higher concentrations of contaminants to on- and off-base water supply wells.



Installation Restoration Program Irp Stage 3 Operable Unit B Engineering Evaluation Cost Analysis Environmental Assessment For Mcclellan Afb Em Mcclellan Afb California


Installation Restoration Program Irp Stage 3 Operable Unit B Engineering Evaluation Cost Analysis Environmental Assessment For Mcclellan Afb Em Mcclellan Afb California
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 1990

Installation Restoration Program Irp Stage 3 Operable Unit B Engineering Evaluation Cost Analysis Environmental Assessment For Mcclellan Afb Em Mcclellan Afb California written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1990 with categories.


This cost analysis and environmental impact report presents the results of a comparative analysis of removal action options for the McClellan AFB Operable Unit B. This report documents the removal action selection process and presents the actions selected to mitigate the groundwater. Partial contents: Type of facilities and operational status; Soils; Surface water; Groundwater; Land use; Use, storage, and disposal of chemicals; Potential and known discharges; Contamination distribution; Potential health or environmental impacts; Exposure assessment; Toxicity assessment; Risk characterization; Removal scope; Ground/water extraction; Groundwater treatment plan; Industrial wastewater treatment plan; Sanitary sewer system; Reinjection of treated groundwaters into aquifer; Groundwater monitoring; Analysis of removal action alternatives.



Government Reports Announcements Index


Government Reports Announcements Index
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 1996-05

Government Reports Announcements Index written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1996-05 with Science categories.




Government Reports Annual Index


Government Reports Annual Index
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 199?

Government Reports Annual Index written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 199? with categories.




Environmental Pollution Control


Environmental Pollution Control
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 1991

Environmental Pollution Control written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1991 with Pollution categories.




Annual Report 1989 90


Annual Report 1989 90
DOWNLOAD
Author : New Brunswick. Department of Transportation
language : en
Publisher:
Release Date : 1991

Annual Report 1989 90 written by New Brunswick. Department of Transportation and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1991 with categories.


General activity review of associated branches and agencies to the Department which includes corporate securities registrations, a list of tenders received, and general financial data. Branches and agencies reviewed are responsible for motor vehicle activity, highway construction, traffic engineering, telecommunications and public utilities.



Installation Restoration Program Engineering Evaluation Cost Analysis Field Investigation Work Plan Irp Sites No 7 And No 8 120th Montana Air National Guard Great Falls Montana


Installation Restoration Program Engineering Evaluation Cost Analysis Field Investigation Work Plan Irp Sites No 7 And No 8 120th Montana Air National Guard Great Falls Montana
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 1997

Installation Restoration Program Engineering Evaluation Cost Analysis Field Investigation Work Plan Irp Sites No 7 And No 8 120th Montana Air National Guard Great Falls Montana written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1997 with categories.


A field Investigation will be conducted at IRP Sites No. 7 (Dry Well off Corrosion Control Building) and No. 8 (Dry Well off Composite Maintenance Building), Montana Air National Guard, Great Falls International Airport, Great Falls, Montana. The Remedial Investigation (RI), completed in May 1997, recommended that an Engineering Evaluation/Cost Analysis be performed at Sites 7 and 8 to determine the significance of the groundwater contamination, and what remedial measures, if any, should be taken. The field investigation will consist of installing four (4) monitoring wells at each site, collecting and analyzing groundwater from each well, and measuring hydraulic properties of the groundwater. The objectives of this investigation will be to assess the extent of groundwater contamination, to determine the potential risk of the contamination to human health and the environment, and to evaluate removal action alternatives.



Installation Restoration Program Irp Stage 3 Mcclellan Air Force Base Operable Unit B Preliminary Assessment Summary Report Volume 2 Appendix B Part 2


Installation Restoration Program Irp Stage 3 Mcclellan Air Force Base Operable Unit B Preliminary Assessment Summary Report Volume 2 Appendix B Part 2
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 1991

Installation Restoration Program Irp Stage 3 Mcclellan Air Force Base Operable Unit B Preliminary Assessment Summary Report Volume 2 Appendix B Part 2 written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1991 with categories.




Installation Restoration Program Irp Mcclellan Air Force Base Operable Unit B Action Memorandum


Installation Restoration Program Irp Mcclellan Air Force Base Operable Unit B Action Memorandum
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 1991

Installation Restoration Program Irp Mcclellan Air Force Base Operable Unit B Action Memorandum written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1991 with categories.


The purpose of this action memorandum is to document approval of a ground water removal action in Operable Unit (OU) B of McClellan Air Force Base (AFB), California. The removal action abates the impacts of contaminated ground water in specific areas of OU B. Operable Unit B is the southwestern portion of McClellan AFB, and extends off-base. The impact to public health and environmental impact caused by contaminants in OU B, including soil, soil gas, and other areas of ground water contamination, will be addressed in the OU B remedial Investigation/Feasibility Study. Investigations of the ground water found contamination migration toward two water supply wells. Three contaminant plumes have been identified, based on composition of contaminants and historical ground water flow direction. The contaminants in the ground water are mostly volatile organic compounds that were used in industrial processes at McClellan AFB. The sources of the contaminant plumes are currently unknown. Ground water contamination is primarily the result of waste disposal practices. Contamination of soils has been confirmed at six sites and three study areas in OU B.



Installation Restoration Program Irp Operable Unit B1 Remedial Investigation Feasibility Study


Installation Restoration Program Irp Operable Unit B1 Remedial Investigation Feasibility Study
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 1993

Installation Restoration Program Irp Operable Unit B1 Remedial Investigation Feasibility Study written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 1993 with categories.


This document presents the results from the remedial investigation and feasibility study for Operable Unit (OU) B1 at McClellan AFB, Sacramento, CA. Operable Unit B1 includes the Defense Reutilization and Marketing Office (DRMO) storage lot and Civil Engineering storage lot at McClellan AFB. The main chemicals of concern are PCBs, dioxins, and furans which may have leaked from transformers stored at OU B1 or were constituents of waste oil applied to soils to control dust. Sections 1.0 through 4.0 of the report present results from the RI, the potential for contaminant migration/transport from OU B1 and the current and future risks associated with OU B1. The FS begins in Section 5.0 identifying the remedial action objectives, in Sections 6.0 and 7.0, technologies are screened and potential remedial alternatives are developed. The final six remedial alternatives are analyzed and compared to each other using the criteria established in the NCP in Section 8.0.