[PDF] Gold Line Eastside Transit Corridor Phase 2 - eBooks Review

Gold Line Eastside Transit Corridor Phase 2


Gold Line Eastside Transit Corridor Phase 2
DOWNLOAD

Download Gold Line Eastside Transit Corridor Phase 2 PDF/ePub or read online books in Mobi eBooks. Click Download or Read Online button to get Gold Line Eastside Transit Corridor Phase 2 book now. This website allows unlimited access to, at the time of writing, more than 1.5 million titles, including hundreds of thousands of titles in various foreign languages. If the content not found or just blank you must refresh this page





Gold Line Eastside Transit Corridor Phase 2


Gold Line Eastside Transit Corridor Phase 2
DOWNLOAD
Author : CDM Smith
language : en
Publisher:
Release Date : 2022

Gold Line Eastside Transit Corridor Phase 2 written by CDM Smith and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2022 with Bell (Calif.) categories.


Collection of drawings, for review only, related to the Los Angeles County Metropolitan Transportation Authority's Recirculated Draft Environmental Impact Report for the Eastside Transit Corridor Phase 2 project (2022).



Gold Line Eastside Transit Corridor Phase 2


Gold Line Eastside Transit Corridor Phase 2
DOWNLOAD
Author : CDM Smith
language : en
Publisher:
Release Date : 2024

Gold Line Eastside Transit Corridor Phase 2 written by CDM Smith and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2024 with Bell (Calif.) categories.


The Final EIR summarizes revisions to the Project that occurred since the release of the Draft EIR in June 2022. In addition, the Final EIR includes all comments received during the Recirculated Draft EIR public review period (June through August 2022) and responses to these comments. And finally, the Final EIR includes the Mitigation Monitoring and Reporting Program (MMRP) as well as other conditions of approval for the certification of the Final EIR...The Project includes an approximately 4.6 to 9.0-mile extension, depending on the Build Alternative, of the Metro E (formerly Gold) Line, a Light Rail Transit (LRT) line, from its currentterminus at Atlantic Station in the unincorporated area of East Los Angeles to eastern Los Angeles County.



Gold Line Eastside Transit Corridor Phase 2


Gold Line Eastside Transit Corridor Phase 2
DOWNLOAD
Author : CDM Smith
language : en
Publisher:
Release Date : 2022

Gold Line Eastside Transit Corridor Phase 2 written by CDM Smith and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2022 with Bell (Calif.) categories.


The Project would extend the Metro L (Gold) Line, a light rail transit (LRT) line, from its current terminus at the Atlantic Station in the unincorporated community of East Los Angeles to the city of Whittier within the Gateway Cities subregion of Los Angeles County . It would extend the existing Metro L (Gold) Line approximately 3.2 to 9.0 miles and include maintenance and storage facility (MSF) site options and design options, depending on the Build Alternative. A diverse mix of land uses are located along the alignment, including single- and multi-family residences, commercial and retail uses, industrial development, parks and recreational, health and medical uses, educational institutions, and vacant land. The Project would traverse densely populated, low-income, and heavily transit-dependent communities with major activity centers.



Eastside Transit Corridor Phase 2


Eastside Transit Corridor Phase 2
DOWNLOAD
Author : CDM Smith
language : en
Publisher:
Release Date : 2017

Eastside Transit Corridor Phase 2 written by CDM Smith and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2017 with Bell (Calif.) categories.


The purpose of this Technical Study is to address issues identified in the November 2014 Board Motion, which the Metro Board of Directors passed subsequent to the release for public review on August 22, 2014 of the Eastside Transit Corridor Phase 2 Draft Environmental Impact Statement/Environmental Impact Report (Draft EIS/EIR). The Draft EIS/EIR studied two Build Alternatives to extend the Metro Gold Line east of its current terminus at Atlantic Boulevard in East Los Angeles: the State Route (SR) 60 Light Rail Transit (LRT) Alternative and the Washington Boulevard LRT Alternative. Based on the volume and scope of comments received on the Draft EIS/EIR, the Board deferred the selection of a Locally Preferred Alternative (LPA) and determined that additional technical investigation would be needed to address major areas of concern raised by Cooperating Agencies, corridor cities and stakeholders. In addition, the Board directed staff to identify a new north-south connection for the Washington Boulevard LRT Alternative and explore the feasibility of operating both the SR 60 LRT and Washington Boulevard LRT Alternatives. This report describes the results of the technical analysis and associated refinements to the project alternatives. In addition, it summarizes feedback received at community meetings, implications on the project scope and presents additional considerations for project implementation, including funding and environmental next steps. The final section presents recommendations for an updated Project Definition for Metro Board consideration.



Eastside Transit Corridor Phase 2 Study


Eastside Transit Corridor Phase 2 Study
DOWNLOAD
Author : Los Angeles County Metropolitan Transportation Authority
language : en
Publisher:
Release Date : 2009*

Eastside Transit Corridor Phase 2 Study written by Los Angeles County Metropolitan Transportation Authority and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2009* with Local transit categories.




Newhall Ranch Resource Management And Development Plan And Spineflower Conservation Plan


Newhall Ranch Resource Management And Development Plan And Spineflower Conservation Plan
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 2009

Newhall Ranch Resource Management And Development Plan And Spineflower Conservation Plan written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2009 with categories.




Metro Gold Line Eastside Extension


Metro Gold Line Eastside Extension
DOWNLOAD
Author : Los Angeles County Metropolitan Transportation Authority
language : en
Publisher:
Release Date : 2004

Metro Gold Line Eastside Extension written by Los Angeles County Metropolitan Transportation Authority and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2004 with Local transit categories.


The Metro Gold Line Eastside Extension Project is a six-mile, dual track light rail system with eight new stations and one station modification. The system originates at Union Station in downtown Los Angeles where it connects with the Pasadena Gold Line, traveling generally east to Pomona and Atlantic Boulevards. The system will bridge State Route 101 freeway and traverse the existing 1st Street Bridge over the Los Angeles River.



Crenshaw Transit Corridor Project


Crenshaw Transit Corridor Project
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 2011

Crenshaw Transit Corridor Project written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2011 with categories.




Gold Line Phase Ii Pasadena To Montclair Los Angeles And San Bernardino Counties


Gold Line Phase Ii Pasadena To Montclair Los Angeles And San Bernardino Counties
DOWNLOAD
Author :
language : en
Publisher:
Release Date : 2004

Gold Line Phase Ii Pasadena To Montclair Los Angeles And San Bernardino Counties written by and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2004 with categories.




Metro Gold Line Eastside Extension Fta Quarterly Presentation


Metro Gold Line Eastside Extension Fta Quarterly Presentation
DOWNLOAD
Author : Los Angeles County Metropolitan Transportation Authority
language : en
Publisher:
Release Date : 2006

Metro Gold Line Eastside Extension Fta Quarterly Presentation written by Los Angeles County Metropolitan Transportation Authority and has been published by this book supported file pdf, txt, epub, kindle and other format this book has been release on 2006 with Railroads, Local and light categories.